Do you have a question about the Worcester GREENSTAR 30Si and is the answer not in the manual?
Model | GREENSTAR 30Si |
---|---|
Category | Boiler |
Boiler Type | Combi |
Output | 30 kW |
Flow Rate | 12.3 l/min |
Warranty | 5 years |
Fuel Type | Natural Gas |
Mounting | Wall-mounted |
Dimensions (H x W x D) | 710 x 400 x 330 mm |
Essential safety measures to follow before and during installation and operation.
Key regulations and standards that must be adhered to for correct installation.
Overview of the boiler package, components, and key specifications.
Detailed performance figures, dimensions, power consumption, and efficiency ratings.
Diagrams and lists identifying all internal and external components of the boiler.
Procedures for flushing and cleaning the heating system to prevent debris damage.
Requirements for electrical and gas supply, including pressure and wiring standards.
Guidelines for connecting water systems, pipework materials, and system filling.
Instructions for routing, sizing, and installing condensate drainage pipework.
Guidance on the safe routing and termination of the pressure relief valve discharge pipe.
Recommended clearances around the boiler for installation and servicing.
Details of the connections for heating, DHW, and gas supply to the boiler manifold.
Overview of different flue systems and their maximum length capabilities.
Requirements for siting flue terminals to ensure safe discharge and prevent combustion products ingress.
Instructions for safely unpacking the boiler and its mounting frame.
Using the template to mark and drill for the wall mounting frame and flue opening.
Step-by-step guide to safely remove the boiler from its packaging.
Detailed instructions for connecting gas, water, and heating system pipes to the boiler.
Step-by-step guide for fitting the flue system, including measurement and assembly.
Instructions for connecting the condensate drain to the syphon and discharge.
Wiring instructions for mains supply, room stats, programmers, and frost stats.
Diagram showing the location and connections of various electrical components.
Final checks of pipework, gas supply, and connections before initial start-up.
Procedure for filling the central heating system with water and venting air.
Steps to turn on the boiler, set controls, and achieve initial burner ignition.
Guidelines for system flushing, inhibitor addition, and maintaining water quality.
Procedures for checking gas inlet pressure, CO/CO2 levels, and burner settings.
Steps for replacing casing, fitting fascia, and securing the boiler.
Instructions for completing documentation and demonstrating boiler operation to the user.
Procedures for regular inspection, cleaning, and servicing of the boiler.
Step-by-step guides for replacing various internal components of the boiler.
Detailed procedure for adjusting gas and air settings for optimal combustion.
Instructions for converting the boiler from Natural Gas to LPG.
Guide to troubleshooting boiler faults based on indicator lights and symptoms.
Diagram illustrating the operational sequence for central heating demand.
Diagram explaining the sequence for domestic hot water demand and preheat.
Explanation of built-in protection functions like frost stat and pump anti-seize.