TO ACCESS THE CONTROLS
Pull the centre top of the cover panel to
allow the cover to open.
TO ACCESS THE FILLING LOOP
CONNECTION
Pull the front panel away from the boiler
and lift up.
USING THE FILLING LOOP
Remove the Tank drain valve cap.
Connect the filling link between the Flow
valve and the Tank drain valve.
Open the Tank drain valve.
Open the Flow valve and monitor the
pressure on the Control panel pressure
gauge.
When the pressure reaches approximately
1.5 bar close the Flow and Tank drain
valves.
Remove the filling loop.
Repace the Tank drain valve cap.
USER INSTRUCTIONS & CUSTOMER CARE GUIDE
USING YOUR
APPLIANCE
8 716 115 220b (03.2010)
CONTROLS
7
CONTROLS
LIFT
Filling
Loop
connection
PULL
CONTROLS
COVER
2
1
Flow valve
Tank drain
Tank drain
valve