EasyManua.ls Logo

Yamaha F225A - Assembling the Tilt Ram

Yamaha F225A
370 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
69J3D11
7-36
1
2
3
4
5
6
7
8
9
3. Install the balls
7
, manual release spring
8
, and bracket
9
by installing the bolts
0
, then tightening them to the specified
torque.
4. Install the relief valve seal
A
and ball
B
into the gear housing 1
5
.
5. Install the filters
C
and gear pump
D
by
installing the bolts
E
, then tightening
them to the specified torque.
6. Install the manual valve
F
.
Assembling the tilt ram
1. Install the new dust seal
1
, O-rings
2
and
3
, and backup ring
4
into the tilt
cylinder end screw
5
.
T
R
.
.
Gear pump bracket bolt
0
:
7 N·m (0.7 kgf·m, 5.1 ft·lb)
T
R
.
.
Gear pump bolt
E
:
7 N·m (0.7 kgf·m, 5.1 ft·lb)
Power trim and tilt unit

Table of Contents

Other manuals for Yamaha F225A

Related product manuals