EasyManua.ls Logo

Yamato DVS402 - 14 Standard Installation Manual

Yamato DVS402
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44
14. Standard installation manual
*Install the product according to the following: (Confirm separately for optional items or special
specifications)
Model Serial number Date
Installation
mgr.(company name)
Installation mgr.
Judg
ment
№ Item Implementation method
TOC No. Reference page of the
operating instruction manual
Judg
ment
Specifications
1
Included
items
Check for number of staffs against
the included item field
10.Specifications field P.40
・ Visual check of environmental
conditions
Caution:
Take care for environment
2 Installation
・Securing a space
2. Before operating the
unit
・ On the installation site
P. 4
Operation-related matters
1
Source
voltage
・ Measure the user side voltage
(outlet) with a tester
・ Measure voltage during operation
(shall meet the specifications)
Caution:
Always use a plug that meets the
specification for attaching to the
ELB.
2. Before operating the unit
・ Be sure to connect the
ground wire.
・ Power supply is ….
10.Specifications
・Specification - power
supply
P. 4
P. 7
P.40
2
Operation
start
・Starts operation
Performs fixed temperature
operation, auto stop operation,
auto start operation, or program
operation.
2. Before operating the unit
・Installation
procedures…
4. Operating procedures
P. 4 ~
8
P.13~
32
Description
1
Operational
descriptions
Explain operations of each com-
ponent according to the operational
instructions
4. Operating procedures
・Operating procedures
1. Safety precautions
〜13. List of dangerous
materials
P.13~
32
P. 1
〜43
8. Troubleshooting
〜9. After sales service
and warranty
2 Error codes
Explain the customer about error
codes and procedures for release
according to the operational
instructions
P.37
39
3
Maintenance
and
inspection
Explain operations of each com-
ponent according to the operational
instructions
6. Maintenance
procedures
・Daily inspection/
maintenance
P.35
9. After sales service and warranty
4
Completion
of installation
Entries
・ Fill in the installation date and the
installation mgr. on the nameplate
of the main unit
・ Fill in necessary information to
the warranty card and hand it
over to the customer
・ Explanation of the route for
after-sales service
P.39