You have nished squaring your
eave walls.
Leave your temporary brace
in place until you nish
attaching your roof panels.
45
TP Brace
EAVE WALL SQUARING
TP
144"
(365,8 cm)
61"
(154,9 cm)
HINT:
FINISH
PARTS REQUIRED:
3" (7,6 cm)


2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
TP
Temporary Brace
BEGIN
Assemble two TP’s with edges ush to 144” length using (3) 3” screws as shown .
At the middle stud  install brace ush under top plate at each end using (1) 3” screw 
Measure from end of brace (inside wall panel) 61” (154,9 cm) and mark a vertical line on brace 
.
Locate a TP in approximately the position shown in  and attach at lower end using (1) 3” screw.
With assistance, push or pull the wall until TP is ush to the mark and top of brace .
Secure TP onto brace using (2) 3” screws.
1
3
I
Flush TP Brace up under top plate.


Screws



Flush
Flush
TOP
PLATE
MIDDLE
STUD
Mark
Flush
Flush