EasyManua.ls Logo

Yardline BRAXTON - Page 90

Yardline BRAXTON
97 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
88
• Follow directions provided by manufacturer and these instructions.
SHINGLES
- NOT INCLUDED -
Install rst starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.
Starter row must be straight and level all the way across with lower edge of roof deck.
NOTE: If you have installed drip edge install shingles ush to drip edge.
BEGIN
1
TABS UP
Shingle overlaps roof
decking.
1" (2,5 cm) overhang
past roof deck.
1" (2,5 cm) overhang or ush
with drip edge.
(4) Nails
BACK OF
SHED
FRONT OF
SHED
NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.

SHINGLE NAIL PATTERN
1"
(2,5 cm)
NAILS
Sealing Strip
1"
(2,5 cm)
1/2"
(1,3 cm)
Full Rain Slot
Half A Rain Slot
Notch
Notch

Related product manuals