EasyManua.ls Logo

Yardline BRAXTON - Page 91

Yardline BRAXTON
97 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
89
SHINGLES
continued...
Beginning at front of shed, install rst row of shingles with notch at 1" past roof edge or ush with drip edge.
2
2
FRONT OF
SHED
BACK OF
SHED
Notch
- or -

Notch
Roof Deck
1"
(2,5 cm)
Flush with starter row.
Flush with starter row.
Continue installing rows of
shingles by staggering at front.
4
Install second row of shingles ush at top of rst row's rain slots. Ensure 1" overhang or ush to drip edge at front,
stagger each row.
3
Bend in roof
1"
(2,5 cm)
1"
(2,5 cm)
BACK OF
SHED
FRONT OF
SHED
FRONT OF
SHED
Flush with rain slots.
Flush with rain slots.
Notch
Notch

Related product manuals