90
SHINGLES
continued...
Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as
shown below. If shingles overlap at ridge cut to peak with a utility knife.
5
• If more than 5" to rain slot you must install another row of shingles.
5"
(12,7 cm)
or less.
5"
(12,7 cm) MAX.
Top of rain slot.
Cut Off.
You have nished shingling your roof. Proceed to capping the ridge.
FINISH
9
Repeat steps 1 - 7 to shingle the opposite side of your roof. Trim shingles at ridge.
Once both sides are shingled you need to trim ends. Strike a chalk line 1" from edge.
Using your shingle hooked blade carefully cut shingles along chalk line.
6
7
8
CUT