Do you have a question about the yellow jacket BRUTE II and is the answer not in the manual?
Connect hoses at E & F, then tighten. Close valves C & D. Connect hose G to refrigerant.
Connect hoses as illustrated. Close valves A & B, C & D. Crack open back seat E & F.
Purge as in I. Charge as in IV. Connect hose G to refrigerant. Open valves A & B. Close valves C & D.
Purge as in I. Connect hose G to refrigerant. Open valve A. Close valves B & C. Open valve D and throttle.
Close valve D. Connect hose 3 to pump. Open valve C. Open valves A & B. Open valves E & F mid position.
Disconnect pressure control line. Screw union into control line and hose 1. Close B, C & D valves. Open valve A.
Connect hoses at E & F, then tighten. Close valves C & D. Connect hose G to refrigerant.
Connect hoses as illustrated. Close valves A & B, C & D. Crack open back seat E & F.
Purge as in I. Charge as in IV. Connect hose G to refrigerant. Open valves A & B. Close valves C & D.
Purge as in I. Connect hose G to refrigerant. Open valve A. Close valves B & C. Open valve D and throttle.
Close valve D. Connect hose 3 to pump. Open valve C. Open valves A & B. Open valves E & F mid position.
Disconnect pressure control line. Screw union into control line and hose 1. Close B, C & D valves. Open valve A.
| Brand | yellow jacket |
|---|---|
| Model | BRUTE II |
| Category | Measuring Instruments |
| Language | English |
Loading...