EasyManua.ls Logo

York CHAMPION D1EB018 - Page 7

York CHAMPION D1EB018
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Checking Supply Air CFM
To check the supply air CFM after the initial balancing has been
completed:
1.Remove the two ¼ inch dot plugs in the duct panel.
2.Insert at least 8 inches of ¼ inch tubing into each of these
holes for sufficient penetration into the airflow on both sides of
the indoor coil.
3.Using an inclined manometer, determine the pressure drop
across the dry evaporator coil. Since the moisture on an evapo
-
rator coil may vary greatly, measuringthe pressure drop across
a wet coil under fieldconditions would be inaccurate. To ensure
adry coil, the compressors should bedeactivated while the test
is being run.
4.Knowing the pressure drop across a dry coil, the actual CFM
through the unit can be determined from the curve in Coil Delta
P vs. Supply Air CFM figure.
WARNING! Failure to properly adjust the totalsystem air quan
-
tity can result in extensive system damage.
After readings have been obtained, remove the tubes and rein
-
stall the two ¼ inch plugs removed in Step 1.
NOTE: De-energize the compressors before taking any test
measurements to ensure a dry indoor coil.
Unitary Products Group 7
035-16703-001-A-0202
D1NA Coil Delta P vs Airflow
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
400 600 800 1000 1200 1400 1600 1800 2000 2200
Airflow (CFM)
ID Coil Delta P
D1NA024-30
D1NA036
D1NA042
D1NA048-60
D1NA018
Linear (D1NA024-30)
Linear (D1NA036)
Linear (D1NA042)
Linear (D1NA048-60)
Linear (D1NA018)
D1NA048-60D1NA042D1NA024
D1NA018
D1NA036
Get other manuals https://www.bkmanuals.com

Related product manuals