036-21371-001-B-0203
12 Unitary Products Group
CLEARANCES
CENTER OF GRAVITY
Overhead (Top)
1
1
Unit must be installed outdoors. Overhanging structures
or shrubs should not obstruct air discharge outlet.
120”
Front
(Piping and Access Panels
30”
Left Side 24”
Right Side 24”
Rear 24”
Bottom
2
2
Adequate snow clearance must be provided if winter
operation is expected.
0”
Unit
Dim. (inches.)
ABCD
EA090 70-1/8 32 29-5/8 16-1/2
FIGURE 4: UNIT DIMENSIONS & CLEARANCES - OUTDOOR UNITS
AIR
OUT
AIR
IN
AIR
OUT
2-3/4
32
2-1/4
32-1/2
70-1/8
8-3/4
5-3/8
CONTROLBOX
ACCESS
GUAGE
LINE
ACCESS
39
1-3/8*OD
VAPORLINE
5/8*OD
LIQUIDLINE
14-3/4
7/8DIA
CONTROLWIRING
ENTRY
COMPRESSORAND
CONDENSERFANMOTOR
ACCESS
1-3/8DIA.
POWERWIRING
ENTRY
6-3/4
CONDENSERFANMOTOR
ACCESS
7/8"KNOCKOUT
ACCESSORYWIRING
ENTRY
6-3/4
5-7/8
*AIRON3SIDES
EA090
(7-1/2 Ton)
All dimensions are in inches. They are
subject to change without notice. Certified
dimensions will be provided upon request.