EasyManua.ls Logo

York YCWL0118SE User Manual

York YCWL0118SE
188 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
YCWL0056 - 0198
WATER-COOLED LIQUID CHILLERS
STYLE A (60 HZ)
50 - 200 TONS
175KW THROUGH 700KW
INSTALLATION, OPERATION, MAINTENANCE
WATER-COOLED LIQUID CHILLERS
HERMETIC SCROLL
Supersedes: 201.26-NM1 (617)
Form 201.26-NM1 (118)
035-21965-101
R410A
Products are produced at a
f a c ilit y whose q u a l ity-
management sys tems are
ISO9001 certified.
Issue Date:
January 19, 2018

Table of Contents

Questions and Answers:

York YCWL0118SE Specifications

General IconGeneral
BrandYork
ModelYCWL0118SE
CategoryChiller
LanguageEnglish

Summary

Section 1 – General Chiller Information and Safety

Safety Guidelines

Standards, responsibilities, and general safety precautions for operation.

Equipment Misuse and Hazards

Covers suitability, electrical, pressure systems, and other equipment hazards.

Section 2 – Product Description

Control System Features

Details programmable setpoints, displayed data, system and unit safeties.

Section 4 – Installation

Electrical Installation Procedures

Guidance on field wiring, power connections, and control panel wiring for safe operation.

Control Wiring Diagrams

Schematics illustrating the control circuit connections for the chiller.

Section 5 – Technical Data

Electrical Specifications

Detailed electrical data for single/dual point connections and ground wire sizing.

Wiring Diagrams and Connections

Schematics for power supply, elementary, and connection wiring.

Section 6 – Commissioning

Startup Procedures

Includes startup checklist, power checks, and superheat/subcooling adjustments.

Unit Operating Sequence

Description of the unit's start-up and operating sequence for capacity control.

Section 7 – Unit Controls

Status Monitoring and Display

Explains status key messages, unit status, and display/print key functions.

Programming and Configuration

Guides on using entry keys for setpoints, schedules, options, and clock.

Section 8 – Unit Operation

Capacity Control Logic

How capacity is controlled via pressure limits and load staging.

Section 9 – Service and Troubleshooting

Troubleshooting Common Faults

Guide to diagnosing and resolving common operational problems and faults.

Related product manuals