Do you have a question about the York YLAA0170 and is the answer not in the manual?
Details on chiller design standards, safety compliance, and quality assurance measures.
A comprehensive checklist of tasks required before placing the units into operation.
Comprehensive electrical specifications including power supply, voltage ranges, and compressor heaters.
Initial checks and preparations to be performed with the unit power switched off before commissioning.
Detailed steps for checking and charging the refrigerant in the unit's systems.
Procedures for calculating and verifying suction superheat and liquid subcooling for system optimization.