youngmangroup.com
Step 5: Setting the Platform Height
19
Platform Height 1.50 Metres
1. Erect the Safety Cage as described on pages 8 to 10.
Refer to the diagrams on page 20.
2. Place your foot on RUNG 9 and lift RUNG 5 on the LEFT frame until locked.
3. Place your foot on RUNG 9 and lift RUNG 5 on the RIGHT frame until locked.
4. Place your foot on RUNG 9 and lift RUNG 6 on the RIGHT frame until locked.
5. Place your foot on RUNG 9 and lift RUNG 6 on the LEFT frame until locked.
6. Attach the Platform to RUNG 3 as described on pages 11 and 12.
7. See ‘Deploying the Platform Stabilisers’ described on pages 14 and 15.
Extend and lock a platform stabiliser above the rung containing the BLUE bracket
until BLUE shows in the viewing window in the stabiliser. Ensure it is locked.
8. Place the stabiliser hook over the BLUE bracket and push down to lock it in place.
9. Repeat steps (7) and (8) for the other platform stabilisers.
10. Fit the Toe boards as described on page 13.
11. Deploy the ground-stabiliser legs as described on page 7.
Platform Height Lift
This Rung Then Rung 6
5
Rung
1.50m