EasyManua.ls Logo

Youngman TTA02 - Page 23

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
youngmangroup.com
23
Platform Height 2.00 Metres
1. Erect the Safety Cage as described on pages 8 to 10.
Refer to the diagrams on page 24 and 25.
2. Place your foot on RUNG 9 and lift RUNG 3 on the LEFT frame until locked.
3. Place your foot on RUNG 9 and lift RUNG 3 on the RIGHT frame until locked.
4. Place your foot on RUNG 9 and lift RUNG 4 on the RIGHT frame until locked.
5. Place your foot on RUNG 9 and lift RUNG 4 on the LEFT frame until locked.
6. Place your foot on RUNG 9 and lift RUNG 5 on the LEFT frame until locked.
7. Place your foot on RUNG 9 and lift RUNG 5 on the RIGHT frame until locked.
8. Place your foot on RUNG 9 and lift RUNG 6 on the RIGHT frame until locked.
9. Place your foot on RUNG 9 and lift RUNG 6 on the LEFT frame until locked.
10. Attach the Platform to RUNG 3 as described on pages 11 and 12.
11. See ‘Fitting the Platform Stabilisers’ described on pages 14 and 15.
12. Extend and lock a platform stabiliser above the rung containing the RED
bracket until RED shows in the viewing window in the stabiliser. Ensure it is
locked.
13. Place the stabiliser hook over the RED bracket and push down to lock it
in place.
14. Repeat steps (12) and (13) for each of the other platform stabilisers.
15. Fit the Toe boards as described on page 13.
16. Deploy the ground stabiliser legs as described on page 7.
Step 5: Setting the Platform Height
Platform Height
Extend Rungs
3, 4, 5 & 6
7
Rung
2.00m