2. Once your pump (B) is in the right position and magnetized in place with the
strap, attach the premade joint piece (A) on top of it. This would be the time to
make sure it aligns well with your filter bag (C) in place. Adjustment may be
necessary.
3. Once A,B, and C are in place it is time to add the rest of the filtration line. The
hoses should connect together with some force. Be sure to use the T connector
in the middle, followed by the elbow at the end.
6. PLUG - IN AND VERIFY SAFETY
Plug Grounding Probe, Temperature Controller, and UV Pump into the GFCI outlet. For
safety, the tank water should be electrically grounded due to a possible induced current
from the heaters. Make sure the Grounding Probe is plugged in and submerged at all
times.
12