EasyManua.ls Logo

Zephyr ZGS-12000-7 - Page 10

Zephyr ZGS-12000-7
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fixed Hoist Test Facility Operation and Maintenance Manual ZOM-12000-7 rev 0
Page 10 of 24
This manual contains proprietary information and is not to be copied or disclosed without written
permission from Zephyr International LLC. Copyright 2006-2008
o With two people or a crane stand up the I beam upright
o Place the attaching brackets into position and attach all the screws.
Attaching brackets