INSTALLATION AND MAINTAINANCE
After installing the unit allows the tank to fill completely with clean water to flush the system. Drain the tank and allow
it to fill up again. The unit is ready to use.
Operation
Replace the cartridges as recommended for continuous efficient working of ZERO B UV Grande
PP spun fliter with bag - After 6 months
UV Chamber After 1 year
Carbon cartridge with ESS - After 6 months
Outer body of Zero B UV Grande purifier should be cleaned with soft cotton cloth
Maintenance
TANK CLEANING
Unlike other water purifiers the water tank remain clean because of inbuilt ESS system
Switch off the power.
Dispense all the water from the tank
Pull out the tank gently from the unit clean the tank and the lid using mild liquid soap and fresh water. Ensure that
the tank does not have any offensive smell before installing.
It is highly recommended that the tank should be cleaned as per the above process
How to clean the tank ?
The tank should be cleaned
During installation
Once in a month or when not in use
When to clean the tank?