EasyManuals Logo

Zodiac CADET ROLL UP 200 User Manual

Zodiac CADET ROLL UP 200
17 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
/ 10
E
N
G
L
I
S
H
7
INFLATION
Activate all valves into inflation position.
Fit the hose to the foot-pump.
To inflate your boat properly, the bottom side of
the foot-pump must rest on a flat ground.
Pump evenly to inflate rapidly.
CAUTION
DO NOT USE A COMPRESSOR OR A BOTTLE OF COMPRESSED AIR
You can use the electrical air pump ACCESS (ask your Dealer).
TO INFLATE THE MAIN BUOYANCY TUBE
Insert the pump hose end piece
Inflate (pressure = 240 mb, refer to PRESSURE section) making sure that each compartment is
equal. When correctly inflated, the internal bulkheads (a) are not visible.
NEVER COMPLETELY
INFLATE A
COMPARTMENT TO FULL
PRESSURE IF OTHER
COMPARTMENTS ARE
TOTALLY DEFLATED
a
100 %
0 % 0 %
1
50 %
50 %
50 %
2
100 %
100 %
100 %
CADET SOLID : INFLATE THE KEEL
Once the floor in assembled, start inflation of the keel (pressure = 240 mb).
Inflation is over: fit the valve caps tight (clockwise).
NOTICE :
A slight air-leak before screwing the valve caps is normal.
ONLY THE VALVE CAPS CAN ENSURE FINAL AIR TIGHTNESS.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zodiac CADET ROLL UP 200 and is the answer not in the manual?

Zodiac CADET ROLL UP 200 Specifications

General IconGeneral
BrandZodiac
ModelCADET ROLL UP 200
CategoryBoat
LanguageEnglish

Related product manuals