2 / 10
ASSEMBLY PROCEDURE
The boat assembly procedure follows an order you must respect. Proceed step by step,
referring each time to the pages indicated for explanations.
1. Make an inventory of the parts of the boat and get to
know them.
2. Activate the valves in inflating position
3. Slightly inflate the main buoyancy tube
4. Assemble the floorboard (according to chosen
option)
5. Finish inflation of the boat to the correct pressure
DO NOT USE A SHARP TOOL
(CUTTER, KNIFE, ETC.)
The pack must contain: 1 buoyancy tube +
Owner’s manual (2 volumes)
You can equip your boat with many optional accessories (transportation wheels, ladder, lifting
rings etc.). Ask your dealer to advise you.
IF YOU WISH TO ADD LIFTING RINGS (FOR PLACING ON THE DAVIT),
YOU MUST FIX THEM ON THE BUOYANCY TUBE, NEVER ON THE
FLOOR.