5" (12.7 cm) MIN.
Y
1 1/2" (3.8 cm) MIN.
7" (17.8 cm)
6" (15.2 cm) MIN.
2" (5 cm) MIN.
Y
7" (17.8 cm)
STEP 9 INSTALLATION OF ADDITIONAL FIXTURES
9.1) In order to add xtures, a 3” diameter hole must be drilled into the side of the pump chamber using the spotting
template located on page 11.
9.2) Figure 9.1 shows the location on the pump chamber which can be used for adding additional xtures.
CAUTION
Do not plumb into the vertical ribs located on the front left corner of the pump chamber.
9.3) Afx the spotting template on the desired location and center the punch hole center. Use a 3” diameter hole saw
to drill through pump chamber. NOTE: Model 101 is preassembled. Use caution when drilling into tank. Be
sure to remove drilled plastic material from tank.
9.4) Insert a 2” rubber pipe seal (included) into the 3” hole and lubricate the inside diameter with soapy water to allow
for ease of pipe insertion.
9.5) Insert pipe through seal approximately ¾” into tank.
9.6) Refer to Figures 9.2 - 9.5 for Typical installation of Tubs & Lavatories.
SK1589
Check local codes for discharge and
vent sizing and installation.
Figure 9.1
NOTE: The bottom of the additional xture 3" diameter hole must be
5" or 6" minimum above the base of the tank depending upon which
side of the tank is selected. Refer to drawing above. Cut out spotting
template on page 11. Do not plumb into “crosshatched” area.
STEP 8 INSTALLATION OF TOILET
NOTE: Only use the Wax Seal provided with the Floor Flange Extender Kit.
8.1) Free standing Installation (No subooring)
1) Only 1 wax toilet bowl gasket required.
2) Install wax toilet bowl gasket, and toilet as described on the back of the gasket carton.
3) Hook up water line to toilet, ll tank, and test unit.
8.2) Installation of Toilet with ½” or ¾” (Use Floor Flange Extender Kit) Subooring
1) Both wax toilet bowl gaskets are required.
2) Cut a 6½” diameter hole in the suboor centered on the tank opening.
3) Firmly press one of the wax toilet bowl gaskets into the plastic locator ring.
4) Place plastic locator ring on tank and rmly press into place until wax has completely lled the ring. This
can be checked through the 4 air holes on the locator ring.
5) To complete installation, refer to the back of the toilet gasket carton for directions.
6) Hook up water line to toilet, ll tank, and test unit.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zoeller QWIK JON 100 and is the answer not in the manual?

Zoeller QWIK JON 100 Specifications

General IconGeneral
BrandZoeller
ModelQWIK JON 100
CategoryPlumbing Product
LanguageEnglish

Related product manuals