ZXSDRR8854HardwareInstallation
Figure2-5DoNotInstalltheRRUHorizontally
5.Thedevicemustbeinstalledinaspecialareawhereprotectionmeasuresaretaken
andonlymaintenancepersonnelunderthecontroloftheresponsibleunitcanenter.
6.Beforemaintainingthedevice,poweroffthedevicetocoolitdown.Thedevicecannot
beoperateduntilthecasetemperatureisbelow70°Ctoavoidscald.
Note:
Thedurationforcoolingthedevicedownafterpower-offcannotbelongerthanthe
maintenancetime.Thedurationforwaitingforthecooldownshouldbedetermined
throughtesting.
2.4InstrumentsandMetersList
Table2-1liststheinstrumentsandmetersrequiredforinstallingtheZXSDRR8854.
Table2-1InstrumentsandMetersList
ItemList
Measuringandrulinginstruments:
5msteeltape,1mruler,gradienter,marker,drillingtemplate
Drillinginstruments:
Electricpercussiondrill(auxiliarydrillbits)andvacuumcleaner
Tighteninginstruments:
Crossscrewdrivers(M3–M6),Allenkey(M5–M6),adjustablewrench
(M10),andtorquewrench
Smallinstruments:
Snipe-nosepliers,diagonalpliers,vices,le,hacksaw,andhydraulic
pressurepliers
General-purpose
instruments
2-6
SJ-20160405141455-003|2018-01-03(R1.3)ZTEProprietaryandCondential