EasyManuals Logo

3 Day Blinds 2 User Manual

Default Icon
8 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
|
2 & 2
1
/
2
" Wood & Faux Wood & Angled Slat Blinds1
GETTING STARTED
Steel Tape Measure
Power Drill and
Drill Bits
Awl (or tool for starting
a screw hole)
Level
Pencil
Flathead & Phillips
Screwdriver
Included in your order is all the hardware necessary for a
normal installation. Depending on the mounting surface,
fasteners other than the screws provided may be required.
Wall board and plaster require the use of anchors such as
expansion or toggle bolts. Bricks, tile and stone need special
plugs and drill bits. Wood should always be pre-drilled to
avoid splitting.
Professional installation is also available in most areas,
call 800-800-3329.
A few simple tools are required:
2 & 2
1
/
2
" WOOD
& FAUX WOOD
& ANGLED SLAT
BLINDS
OPTIONAL HARDWARE
Hold Down Brackets
with Screws
Glue
STANDARD HARDWARE
End Brackets
(Open Position LH & RH)
Screws
Center Support
Bracket(s)
Valance Clips
Valance & Returns
Spacer Block
(standard for 2
1
/
2
" Wood
& Faux Wood outside
mounted blinds only)
Valance Return
Clips

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the 3 Day Blinds 2 and is the answer not in the manual?

3 Day Blinds 2 Specifications

General IconGeneral
Brand3 Day Blinds
Model2
CategoryWindow Blinds
LanguageEnglish

Related product manuals