EasyManua.ls Logo

3Com 5500G - Configuring ACFP

3Com 5500G
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing and Removing the OSN|M 15
3 OSN|M Installation
Installing and
Removing the
OSN|M
The Switch 5500G supports hot swapping the OSN|M.
c
CAUTION: If the Linux system is running on an OSN|M, use the
poweroff command to exit the system before removing the OSN|M.
Installing an OSN|M in a Switch 5500G
To install the OSN|M, perform the following steps:
1 Put on an ESD-preventive wrist strap and make sure that the
ESD-preventive wrist strap is properly grounded. Then take the OSN|M
out of the package.
2 Unscrew the mounting screws on the switch’s expansion module filler
panel and remove the filler panel.
3 Hold the two sides of the OSN|M front panel with both hands, and slide
in the OSN|M along the guide rails until the OSN|M is fully inserted into
the switch as shown in Figure 3.
4 Use a screwdriver to fasten the fastening screws on both sides of the
OSN|M.

Other manuals for 3Com 5500G

Related product manuals