POTS>Load Coils>Operation
4. Use the up and down arrow
keys to select the correct
wire gauge.
Press
OK
to return to
Load Coil screen.
5. Press
Test
to start the test.
6. The results show 3 load
coils and the first load coil
is at a distance of 6,032
feet.