EasyManua.ls Logo

A.H.Beard Genius - Installation Guide; Initial Setup Steps

A.H.Beard Genius
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
To install the legs, thread the washer over the bolt of the leg with the
recessed side facing the leg, and tighten by hand. Do not over tighten.
STEP 1
STEP 2
Always use two people when setting up the base.
Place the bed base box in a desired location with the bottom of the
box facing up.
Remove the binding straps and packing materials, making sure not
to puncture the box with any sharp objects.
Remove the bed base from the box keeping the bottom of the base
facing upwards.
STEP 3
STEP 4
STEP 5
STEP 6
Uncoil input cord (connected to control box’s
power port) and plug into Power Supply.
To sync two bases with the SmartSync cord - see page 15.
To install optional headboard brackets: See detailed installation
instructions on page 13.
Uncoil the Power Down Box from the frame
and install (2) 9 Volt batteries- not included.
Place box on the ground. Ensure that it is
easily accessible when the base is turned to
its upright position.
Uncoil the Power Cord and connect to the
Power Supply. Place Power Supply on the
ground and extend from the base. Ensure that
the Power Supply and all attached cords are
directed toward the desired surge protector.
installation guide
For customer support, visit www.ahbeard.com or call: 1300 654 000