Lifting the Unit
If cables or chains are used to hoist the unit
they must be the same length. Minimum
cable length is 251.5 cm (99”) for CF Series
9-70 ton units. CF Series 2-7 ton units do not
include factory installed lifting lugs and must
be lifted by forklift only. Care must be taken
to prevent damage to the cabinet, coils, and
condenser fans.
Before lifting unit, be sure that all shipping
material has been removed from unit. Secure
hooks and cables at all lifting points / lugs
provided on the unit.
Figure 3 - Lifting Details and Orientation of
a CF Series 9-70 ton Condensing Unit
Locating the Unit
The CF Series condenser and condensing unit
is designed for outdoor applications and
mounting at ground level or on a rooftop. It
must be placed on a level and solid
foundation that has been prepared to support
its weight. When installed at ground level, a
one-piece concrete slab must be used with
footings that extend below the frost line. Also
with ground level installation, care must be
taken to protect the coil fins from damage due
to vandalism or other causes.
The first clearance table below gives the
clearance values for proper unit operation.
The second clearance table gives the
clearance necessary for removing the coil
without disassembling a large part of the
condensing unit. For ease of removing the
condenser coil, use the second table
clearances for the right hand side of the unit.
Table 1 - Clearances for Proper Operation
Location
(Controls
Unobstructed 91.4 (36)
Table 2 - Clearances for Coil Pull
Figure 4 - Orientation of Series 2-7 ton