CF Series Startup Form
Job Name:_____________________________________________
Date:_____________
Address:____________________________________________________________________
____________________________________________________________________________
Model Number:_______________________________________________________________
Serial Number:___________________________________________
Tag:______________
Startup Contractor:____________________________________________________________
Address:____________________________________________________________________
_______________________________________________________
Phone:_____________
Pre Startup Checklist
Installing contractor must verify the following items.
1. Is there any visible shipping damage?
Yes No
2. Is the unit level?
Yes No
3. Are the unit clearances adequate for service and operation?
Yes No
4. Do all access doors open freely and are the handles operational?
Yes No
5. Have all shipping braces been removed?
Yes No
6. Have all electrical connections been tested for tightness?
Yes No
7. Does the electrical service correspond to the unit nameplate?
Yes No
8. On 208/230V units, has transformer tap been checked?
Yes No
9. Has overcurrent protection been installed to match the unit nameplate
requirement?
Yes No
10. Have all set screws on the fans been tightened?
Yes No
11. Do all fans rotate freely?
Yes No
Ambient Temperature
Ambient Dry Bulb Temperature _____°C/°F
Ambient Wet Bulb Temperature _____°C/°F
Voltage
L1-L2
L2-L3
L1-L3
L1-Ground
L2-Ground
L3-Ground