- 8 -
Min. Level
H
L
Max. Level
L
H
A
C
B
A B
C
H L
L H
C
A
B
A B
C
H L
PHASE 2 - TRANSMITTER INSTALLATION
Flow measurement with gas or liquids with solids in suspension
1. Place the taps to the top or side of the line.
2. Mount the transmitter above the taps.
Level measurement with open tanks
1. Mount the transmitter at the same height or below the lowest level to be measured.
2. Connect the + (H) side of the transmitter to the bottom of the tank.
3. Vent the - (L) side of the transmitter to the atmosphere.
Flow
3-valve
manifold
gate valve
gate
valves
3-valve
manifold
drain
valve
Flow

Other manuals for ABB 266D Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB 266D Series and is the answer not in the manual?

ABB 266D Series Specifications

General IconGeneral
BrandABB
Model266D Series
CategoryTransmitter
LanguageEnglish

Related product manuals