INSTALLATION AND CONFIGURATION MANUAL
Getting started
AC500 V2 products
Question and Answer IconNeed help?

Do you have a question about the ABB AC500 V2 and is the answer not in the manual?

ABB AC500 V2 Specifications

General IconGeneral
SeriesAC500 V2
Operating SystemReal-time operating system
MountingDIN rail
Supply Voltage24 V DC
Operating Temperature-25°C to +60°C
Protection ClassIP20
Product TypeProgrammable Logic Controller
CommunicationEthernet, Modbus, CANopen
Programming LanguagesIEC 61131-3 (LD, FBD, IL, SFC, ST)
MemoryUp to 4 MB user memory

Summary

AC500 V2 Installation and Configuration

Getting Started with Example Projects

Introduces example projects and guides through initial setup steps for AC500 V2.

AC500 V2 Safety Instructions

Crucial safety guidelines and precautions for handling and operating AC500 V2 systems.

Automation Builder Software Setup

Guide to installing and configuring the Automation Builder engineering software suite.

AC500 V2 Hardware and System Assembly

Details on AC500 V2 hardware and steps for physical assembly and connection.

Central I/O Expansion Project Setup

Step-by-step guide to creating and configuring a project with central I/O expansion.

PLC Programming and Compiling

Instructions for writing, compiling, and managing PLC program code using CODESYS.

Communication Gateway Configuration

Configuration of communication parameters for PC-PLC connection via Ethernet.

Program Download and Testing

Process for downloading the program to the CPU and verifying its operational functionality.

Visualization Setup Guide

Guide to creating graphical user interfaces for monitoring and controlling the PLC.

CPU Reset Procedures

Methods for resetting the PLC CPU to its default or initial state for maintenance.

Remote I/O Expansion with PROFINET

PROFINET Project Preconditions

Prerequisites and requirements for setting up the remote I/O expansion project.

PROFINET Controller Configuration

Configuration of the PROFINET controller module for managing remote I/O devices.

PROFINET Device Setup and Mapping

Configuration steps for setting up PROFINET devices and mapping their I/O.

Integrating Remote I/O into Project

Process for adding remote I/O modules and relevant program logic to the project.

PROFINET Program Testing and CPU Reset

Procedures for testing the program with remote I/O and resetting the CPU.

Further Information on AC500 Portfolio

AC500 PLC Resources and Support

Links to ABB PLC website, catalog, application examples, and customer support.