EasyManua.ls Logo

ABB CP600-eCo - 10 Touchscreen Calibration; 11 Unpacking and Packing Instructions

ABB CP600-eCo
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
11 Unpacking and packing Instructions
Touchscreen calibration / Unpacking and packing instructions
to repack the unit, follow the instructions backwards.
10 Touchscreen calibration
CP600-eCo control panels support calibration of the interface. To start calibration proceed as follow:
1) Use the “tap-tap” procedure at boot (this procedure consists in tapping the surface of
the touchscreen during the device power-up phase. Tapping frequency must be high.
You have to start tapping the touchscreen as soon as power has been applied to the
device). When the sequence has been recognized, the system shows the message:
“TAP-TAP DETECTED”.
2) Release touch and wait few seconds until the message “ENTERING SYSTEM
SETTINGS” appears
3) Press and hold touch for few seconds for selecting “TOUCHSCREEN CALIBRATION”.
CP604, CP607
CP610

Related product manuals