Do you have a question about the ABB DODGE PARA-FLEX and is the answer not in the manual?
Mount and position flanges on shafts to achieve the specified dimension "B" for the coupling size.
Align flanges using precision equipment or scales/calipers for angular and parallel offset.
Loosen clamp ring screws to one or two threads, preparing for flexible element installation.
Loosen clamp ring screws, remove element, and clean clamping parts with solvent.
Tighten clamp ring screws evenly and gradually to full torque to prevent deflection.
Clean flange mounting area and contact surface with solvent; use soapy water for aid.
Wrap element around flanges, work beads onto seats, and tap to ensure proper seating.
Tighten clamp ring screws alternately or in a star pattern to specified torque.
Install coupling guards per OSHA requirements to contain the tyre if thrown.
Disassemble clamp rings, place on shafts, and remove anti-rust lubricants from grooved sides.
Mount floating shaft assembly between flanges, seating pilot, and tightening screws.
Align flanges using precision equipment or scales/calipers for angular and parallel offset.
Couplings comply with ATEX directive 2014/34/EU for categories 2, M2, and 3.
Provides tables for coupling sizes, flange styles, torque, and distance between flanges.
Couplings are not fail-safe; overloads can cause damage, explosion hazards, or projectiles.
Guard rotating parts, inspect periodically, check vibration, use proper grounding, and secure guards.
PARA-FLEX couplings accept axial movement up to 5/16" but are not thrust bearing members.
Explains how to read the date code indicating month and year of manufacture.
Mount and position flanges on shafts to achieve the specified dimension "B" for the coupling size.
Align flanges using precision equipment or scales/calipers for angular and parallel offset.
Loosen clamp ring screws to one or two threads, preparing for flexible element installation.
Loosen clamp ring screws, remove element, and clean clamping parts with solvent.
Tighten clamp ring screws evenly and gradually to full torque to prevent deflection.
Clean flange mounting area and contact surface with solvent; use soapy water for aid.
Wrap element around flanges, work beads onto seats, and tap to ensure proper seating.
Tighten clamp ring screws alternately or in a star pattern to specified torque.
Install coupling guards per OSHA requirements to contain the tyre if thrown.
Disassemble clamp rings, place on shafts, and remove anti-rust lubricants from grooved sides.
Mount floating shaft assembly between flanges, seating pilot, and tightening screws.
Align flanges using precision equipment or scales/calipers for angular and parallel offset.
Couplings comply with ATEX directive 2014/34/EU for categories 2, M2, and 3.
Provides tables for coupling sizes, flange styles, torque, and distance between flanges.
Couplings are not fail-safe; overloads can cause damage, explosion hazards, or projectiles.
Guard rotating parts, inspect periodically, check vibration, use proper grounding, and secure guards.
PARA-FLEX couplings accept axial movement up to 5/16" but are not thrust bearing members.
Explains how to read the date code indicating month and year of manufacture.
| Brand | ABB |
|---|---|
| Model | DODGE PARA-FLEX |
| Category | Industrial Equipment |
| Language | English |
Loading...