Emax
Installation, service and maintenance
instructions for low voltage air
circuit-breakers
Installation and
service instructions
1SDH000460R0002 L6555

Table of Contents

Questions and Answers

Summary

4. Electrical Connections

4.1. Power Circuit Connections

Connecting to the main power circuit.

4.3. Wiring Auxiliary Circuits

Connecting the circuit-breaker's auxiliary circuits.

5. Putting into Service

5.1. General Procedures and Checks

Steps and checks before and during commissioning.

6. Operating Instructions

6.2. Closing and Opening Procedures

Manual and electrical procedures for operation.

6.3. Racking-In and Racking-Out Operation

How to move the withdrawable circuit-breaker.

7. Maintenance

7.1. Warnings and Program Overview

Safety precautions and schedule for maintenance.

7.2. First Level Maintenance Operations

Routine checks, cleaning, and connection checks.

7.3. Second Level Maintenance Operations

In-depth checks, component inspection, and testing.

8. Troubleshooting Operating Anomalies

8.1. Common Anomalies and Remedies

Table of faults, causes, and solutions for operating issues.

10. Protection Releases: PR121;P Relay

10.3. Relay Identification and Specifications

Details on the PR121/P relay's features and compatibility.

10.4. User Interface and Controls

Description of the relay's front panel, dip switches, LEDs, and buttons.

10.5. Protection Functions Overview

Explanation of various protection settings (L, S, I, G, Neutral).

10.6. Relay Testing and Troubleshooting

Procedures for commissioning, parameter setting, and fault diagnosis.

Summary

4. Electrical Connections

4.1. Power Circuit Connections

Connecting to the main power circuit.

4.3. Wiring Auxiliary Circuits

Connecting the circuit-breaker's auxiliary circuits.

5. Putting into Service

5.1. General Procedures and Checks

Steps and checks before and during commissioning.

6. Operating Instructions

6.2. Closing and Opening Procedures

Manual and electrical procedures for operation.

6.3. Racking-In and Racking-Out Operation

How to move the withdrawable circuit-breaker.

7. Maintenance

7.1. Warnings and Program Overview

Safety precautions and schedule for maintenance.

7.2. First Level Maintenance Operations

Routine checks, cleaning, and connection checks.

7.3. Second Level Maintenance Operations

In-depth checks, component inspection, and testing.

8. Troubleshooting Operating Anomalies

8.1. Common Anomalies and Remedies

Table of faults, causes, and solutions for operating issues.

10. Protection Releases: PR121;P Relay

10.3. Relay Identification and Specifications

Details on the PR121/P relay's features and compatibility.

10.4. User Interface and Controls

Description of the relay's front panel, dip switches, LEDs, and buttons.

10.5. Protection Functions Overview

Explanation of various protection settings (L, S, I, G, Neutral).

10.6. Relay Testing and Troubleshooting

Procedures for commissioning, parameter setting, and fault diagnosis.

ABB Emax E1 Specifications

General IconGeneral
BrandABB
ModelEmax E1
CategoryPower Tool
LanguageEnglish