Installation, service and maintenance
instructions for low voltage air
circuit-breakers
Installation and
service instructions
1SDH000460R0002 L6555

Table of Contents

Questions and Answers

Summary

4. Installation Procedures

4.1 Installation Room Requirements

Specifies environmental conditions and safety for the installation location.

4.2 Fixed Circuit-Breaker Installation

Provides instructions for securely mounting the fixed circuit-breaker.

4.3 Withdrawable Part Installation

Steps for installing the fixed part of a withdrawable circuit-breaker unit.

5. Electrical Connections

5.1 Power Circuit Connections

Guidelines for connecting the circuit-breaker to the main power circuit.

6. Putting Into Service

6.1 General Procedures

Pre-commissioning checks and essential steps before operation.

7. Instructions for Use

7.1 Operating & Signalling Parts

Identifies front panel controls, indicators, and their functions.

7.2 Closing & Opening Procedures

c) Closing the Circuit-Breaker

Step-by-step guide for closing the circuit-breaker.

d) Opening the Circuit-Breaker

Step-by-step guide for opening the circuit-breaker.

7.3 Racking-In;Out Operation

Racking Positions

a) Disconnected Position

Moving the circuit-breaker to the disconnected state.

b) To Test Isolated Position

Transitioning the circuit-breaker to the test isolated state.

c) To Connected Position

Transitioning the circuit-breaker to the connected state.

d) Reverse Transition

Moving from connected back to test isolated or disconnected.

8. Maintenance Introduction

8.1 Maintenance Warnings

Crucial safety precautions to follow before performing maintenance.

8.2 Maintenance Programme

Overview of maintenance intervals and switch life expectations.

8.3 First Level Maintenance

8.3.2 Checks & General Cleaning

Procedures for cleaning and inspecting the circuit-breaker.

8.3.7 Protection Releases Check

8.4 Second Level Maintenance

8.4.7 Checking Contact Wear

8.4.8 Protection Releases Verification

9. Operating Anomaly Measures

10. Accessories

10.2 Mechanical Locks

11. Protection Releases - General Notes

11.1 Safety Notes

Crucial safety warnings related to protection release operations.

12. SACE PR121;P Relay

12.2 Specifications & Characteristics

12.3 User Interface

12.3.3 Rating Plug Functionality

12.3.4 iTest Button Usage

12.4 Protection Functions

12.4 Protection Functions Details

12.4.6 Instantaneous Short-Circuit Protection

12.4.7 Protection Summary Table

12.5 Main Functions

12.6 Commissioning & Settings

12.8 Troubleshooting

12.8.1 Troubleshooting Table

A table listing common faults, possible causes, and suggested solutions.

12.8.2 Handling Faults

Procedures for responding to relay malfunctions or unexpected trips.

12.9 External Units Overview

13. Overall Dimensions

Withdrawable Circuit-Breaker Dimensions

14. Circuit Diagrams

WARNING for Circuit Diagrams

Safety warning before consulting circuit diagrams.

Circuit Diagram Captions

Circuit Diagram Symbols

Motor & Release Circuit Diagrams

Auxiliary Circuits & Measuring Module Diagrams

Communication & Signalling Module Diagrams

Summary

4. Installation Procedures

4.1 Installation Room Requirements

Specifies environmental conditions and safety for the installation location.

4.2 Fixed Circuit-Breaker Installation

Provides instructions for securely mounting the fixed circuit-breaker.

4.3 Withdrawable Part Installation

Steps for installing the fixed part of a withdrawable circuit-breaker unit.

5. Electrical Connections

5.1 Power Circuit Connections

Guidelines for connecting the circuit-breaker to the main power circuit.

6. Putting Into Service

6.1 General Procedures

Pre-commissioning checks and essential steps before operation.

7. Instructions for Use

7.1 Operating & Signalling Parts

Identifies front panel controls, indicators, and their functions.

7.2 Closing & Opening Procedures

c) Closing the Circuit-Breaker

Step-by-step guide for closing the circuit-breaker.

d) Opening the Circuit-Breaker

Step-by-step guide for opening the circuit-breaker.

7.3 Racking-In;Out Operation

Racking Positions

a) Disconnected Position

Moving the circuit-breaker to the disconnected state.

b) To Test Isolated Position

Transitioning the circuit-breaker to the test isolated state.

c) To Connected Position

Transitioning the circuit-breaker to the connected state.

d) Reverse Transition

Moving from connected back to test isolated or disconnected.

8. Maintenance Introduction

8.1 Maintenance Warnings

Crucial safety precautions to follow before performing maintenance.

8.2 Maintenance Programme

Overview of maintenance intervals and switch life expectations.

8.3 First Level Maintenance

8.3.2 Checks & General Cleaning

Procedures for cleaning and inspecting the circuit-breaker.

8.3.7 Protection Releases Check

8.4 Second Level Maintenance

8.4.7 Checking Contact Wear

8.4.8 Protection Releases Verification

9. Operating Anomaly Measures

10. Accessories

10.2 Mechanical Locks

11. Protection Releases - General Notes

11.1 Safety Notes

Crucial safety warnings related to protection release operations.

12. SACE PR121;P Relay

12.2 Specifications & Characteristics

12.3 User Interface

12.3.3 Rating Plug Functionality

12.3.4 iTest Button Usage

12.4 Protection Functions

12.4 Protection Functions Details

12.4.6 Instantaneous Short-Circuit Protection

12.4.7 Protection Summary Table

12.5 Main Functions

12.6 Commissioning & Settings

12.8 Troubleshooting

12.8.1 Troubleshooting Table

A table listing common faults, possible causes, and suggested solutions.

12.8.2 Handling Faults

Procedures for responding to relay malfunctions or unexpected trips.

12.9 External Units Overview

13. Overall Dimensions

Withdrawable Circuit-Breaker Dimensions

14. Circuit Diagrams

WARNING for Circuit Diagrams

Safety warning before consulting circuit diagrams.

Circuit Diagram Captions

Circuit Diagram Symbols

Motor & Release Circuit Diagrams

Auxiliary Circuits & Measuring Module Diagrams

Communication & Signalling Module Diagrams

ABB Emax E3 Specifications