EasyManuals Logo

ABB HT610930 User Manual

ABB HT610930
196 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #162 background imageLoading...
Page #162 background image
Operation Manual / A150-M56/66/57/67 - A155-M..
13 Removing and installing 6-nozzle turbine cleaning component (op-
tional) / 13.1 Disassembly
© Copyright 2021 ABB. All rights reserved. HZTL4032_EN Rev.Q January 2021
Fig.120: Disassembly of the connecting pieces
1. Unscrew hexagon-head screws (51314) from connecting pieces (51313).
2. Remove gaskets (51302).
3. Remove connecting pieces.
4. Remove gaskets from holes.
Fig.121: Disassembly of the cleaning nozzle
u Remove cleaning nozzles (51301) with screw (01) in accordance with the following table.
Product Thread Length [mm] Quantity
A150-M M8 40 1
A155-M M10 50 1
Table72: Dismantling screw
Page 160 / 194

Table of Contents

Other manuals for ABB HT610930

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB HT610930 and is the answer not in the manual?

ABB HT610930 Specifications

General IconGeneral
BrandABB
ModelHT610930
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals