EasyManua.ls Logo

ABB HT846739 - Page 57

ABB HT846739
114 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPS48-D/E.. - TPS61-D/E..
5 Maintenance / 5.3 Turbine cleaning during operation
© Copyright 2020 . All rights reserved. HZTL2410_EN Rev.F March 2020
Recommended operating state for turbine wet cleaning
The following operating state is tested and approved by ABB Turbochar-
ging:
Characteristic / com-
ponent
Conditions
short
Water injection time
long
Water injection time
Engine load (guide value) 20…40%
Turbine inlet temperature
T
TE
before water injection
350…400°C 350…430°C
Water supply ensured
Water pressure (overpres-
sure over atmosphere) p
WT
2.0bar 1.5bar
If necessary, engine performance must be reduced to maintain these
conditions.
The cleaning cycle can now be started based on the following descrip-
tion.
Page 55 / 111

Table of Contents

Related product manuals