Section-0
04-3004_S0_OPM_ABB_POWERSCALE_10-50kVA_EN_150113.doc Page 4/8 ABB
Printed in Switzerland – Modifications reserved
2 SECTION-2:
2.1 BLOCK DIAGRAM
2.1.1 WIRING AND BLOCK DIAGRAMS
2.1.2 RECOMMENDED CABLE SECTIONS & FUSE RATINGS
2.1.3 CONNECTION DIAGRAM POWERSCALE
2.2 FRONT AND REAR VIEW
2.2.1 FRONT AND REAR VIEW OF POWERSCALE CABINET A
2.2.2 FRONT AND REAR VIEW OF POWERSCALE CABINET B
2.2.3 FRONT AND REAR VIEW OF POWERSCALE CABINET C
2.3 BATTERY CONNECTIONS
2.3.1 BATTERY ENCLOSURES CABINETS A,B,C AND EXTERNAL BATTERY
3 SECTION-3:
3.1 INTERFACING
3.1.1 SMART PORT JD1 (SERIAL RS 232 / SUB D9 / FEMALE) AND USB PORT
3.1.2 CUSTOMER INTERFACE AND DRY PORTS (TERMINALS X1 STANDARD)
3.1.3 JR1 / RS485 INTERFACE FOR MULTIDROP
4 SECTION-4:
4.1 OPERATION
4.1.1 COMMISSIONING
4.1.2 CONTROL PANEL
4.1.3 DESCRIPTION OF THE LCD
4.1.4 OPERATING MODES
5 SECTION-5:
5.1 OPERATION – PROCEDURES
5.1.1 START-UP PROCEDURE
5.1.2 SHUTDOWN PROCEDURE
5.1.3 LOAD TRANSFER: FROM INVERTER OPERATION TO MAINTENANCE BYPASS
5.1.4 LOAD TRANSFER: FROM MAINTENANCE BYPASS TO INVERTER OPERATIONS
6 SECTION-6:
6.1 MULTI-CABINET CONFIGURATION
6.1.1 CONCEPT OF MULTI-CABINET CONFIGURATION
6.1.2 INSTALLATION INSTRUCTIONS
6.1.3 COMMISSIONING OF PARALLEL CONFIGURATION
7 SECTION-7:
7.1 MAINTENANCE
7.1.1 USER RESPONSIBILITIES
7.1.2 PREVENTATIVE MAINTENANCE
7.1.3 DEEP BATTERY TEST
7.1.4 BATTERY MAINTENANCE, DISPOSAL AND RECYCLING