Chapter 5
Connection
Programmable Inputs (Sequence start)
When sequence start is going to be used, the wiring should be according to Figure 18 or Figure 19.
The start command (Terminal 5, 6 and 7) must be maintained during th complete starting sequence;
otherwise, a direct stop will be performed.
Soft stop can only be performed for the motor currently fed by the softstarter and will be achieved by
opening the Stop command (Terminal 4).
Figure 18: Internal control voltage Figure 19: External control voltage
Figure 21: Tightening torques and cable dimensions (1 mm=0,0394 in)
M3
?
1. . . . . . . . . . . . . . . . . . . . . . . . 20
0,5 Nm - 4,3 lb.in
3,5x0,6
0,14 ... 2,5 mm
AWG 12 ... 22
0,14 ... 2,5 mm
2
2
5:2.2.5 Programmable output relay K4, terminals 12, 13 and 14
The output relay gives a signal depending on the selected function.
Default: Run
See Chapter 7 “ Settings and conguration” for programming.
Connect the cables to terminal 12, 13 and 14.
Figure 20: Terminals 12, 13, 14
In0
In1
Vc
6
7
8
9
10
Vp
Vp
11
K4
12
13
14
Vn
15
16
K5
17
18
19
K6
20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
100-250V
L
N
Stop
Start
In1 Vc Vn Vp Vp
K4
In0
50/60 Hz
K5 K6
Stop
1
st
Start seq.
2
nd
Start seq.
3
rd
Start seq.
DC
+
-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
100-250V
L
N
Stop
Start
In1 Vc Vn Vp Vp
K4
In0
50/60 Hz
K5 K6
Stop
1
st
Start seq.
2
nd
Start seq.
3
rd
Start seq.
5.6 Low Voltage Products & Systems
1SXU 132 021 M0201 ABB Inc. • 888-385-1221 • www.abb-control.com
5