EasyManua.ls Logo

ABB PST210 User Manual

ABB PST210
10 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Softstart
Upgrade to Torque control
PST30…300
PSTB370…1050
1SFC132040M0201 RevA Dec-06
Contents
1. ESD Warning...................................................................................................................2
2. Tools................................................................................................................................2
3. PCB information ..............................................................................................................2
4. Step by step.....................................................................................................................3
5. Configuration of the LV board..........................................................................................7

Other manuals for ABB PST210

Question and Answer IconNeed help?

Do you have a question about the ABB PST210 and is the answer not in the manual?

ABB PST210 Specifications

General IconGeneral
BrandABB
ModelPST210
CategoryController
LanguageEnglish

Summary

ESD Warning

ESD Safety Precautions

Protect electronic components from electrostatic discharge damage by earthing tools and personnel.

Tools Required

Screwdriver Types for Installation

Specifies Torx T15 for cover removal and Torx T20 for PCB removal.

PCB Information

LV and HV Board Upgrade Versions

Details required LV board (1SFB636068D1011) and HV board (1SFB636068D1013) versions for Torque Control.

Installation Procedure

Preparation and Initial Disconnection

Mark cables, disconnect main voltage, other cables, discharge tools/personnel, and remove front cover.

Board Replacement Process

Disconnect and remove old HV board, then remove old LV board.

New Board Mounting and Connections

Mount new LV and HV boards, reconnect all cables, and perform current transformer checks.

LV Board Configuration

Initial Setup and Navigation

Switch on power, access Service Settings, confirm PCB change, and select display language.

Parameter Programming

Configure essential parameters like CT Ratio, Bypass settings, and SOP values.

Finalization and Torque Control Notes

Complete programming, set motor current/protections, and consult Torque Control manual.