    What does 'Faulty usage' mean on my ABB PSTX370?
    • S
      samuel34Sep 23, 2025
      Do not use jog forward, jog backward, heat motor, or stand-still break functions with an Inside delta motor connection.
  • R
    Richard MooreAug 25, 2025
    What does it mean when my ABB PSTX370 Controller displays 'Ground fault'?
    • G
      george17Aug 25, 2025
      A ground fault indicates that the sum of the instantaneous line currents in your 3-phase system differs more than the specified value. Examine the motor cables and the motor itself for any issues.
  • C
    Christopher OdonnellAug 25, 2025
    What should I do if my ABB PSTX370 displays 'Locked rotor'?
    • D
      David ColeAug 26, 2025
      Examine the bearings of the motor and the load to ensure they run easily. A damaged bearing or a load stock could be the cause.
  • J
    Jacob EatonAug 27, 2025
    What does it mean when my ABB Controller displays 'Overvoltage'?
    • N
      nyoungAug 27, 2025
      An overvoltage error indicates that the main voltage is too high. Perform a check of the main voltage.
  • M
    martinezmathewAug 27, 2025
    What does it mean when my ABB PSTX370 displays 'Under voltage'?
    • K
      kathryn17Aug 27, 2025
      An undervoltage error indicates that the main voltage is too low. Perform a check of the main voltage.
  • J
    Jill HardySep 15, 2025
    What does 'High current' mean on my ABB PSTX370 Controller?
    • S
      stephaniefriedmanSep 15, 2025
      A high current fault indicates that a fault current, higher than 8 times the softstarter's rated current, has occurred. Check the circuits and the motor for an insulation fault between phases or a ground fault.
  • D
    davidreedSep 12, 2025
    What does 'Voltage imbalance' mean on my ABB Controller?
    • S
      Sandra WellsSep 12, 2025
      Voltage imbalance indicates that there is a voltage imbalance between the phases. Check the main voltage and restart the motor.
  • L
    Leonard WheelerSep 13, 2025
    Why does my ABB PSTX370 display 'Too long start time'?
    • L
      leon14Sep 13, 2025
      This indicates that the time taken to soft start the motor is longer than the set value. Check the starting conditions and current limit.
  • M
    mark60Sep 4, 2025
    How do I fix an ABB PSTX370 Controller that shows a blank screen and no LED is active?
    • J
      jason18Sep 4, 2025
      First, ensure that the supply voltage is properly connected, referring to the circuit diagram. Also check that the RJ45 plug is connected between the HMI and the softstarter, and that the RJ45 network cable is not damaged.
  • A
    Ashley JonesSep 2, 2025
    What to do if my ABB Controller motor is humming or starts without a given start signal?
    • D
      Deborah RiveraSep 2, 2025
      This issue could be due to a few reasons. If it's a PSTX30...170 model, a bypass relay might be closed due to inaccurate handling. To resolve this, disconnect the operation voltage and the control supply voltage, remove the USB cable if connected, and then reconnect the voltage in the following sequence: first, the control supply voltage on terminals 1 and 2 (refer to chapter 5.1.2), wait 4 seconds, and then connect the operation voltage on terminals L1, L2, and L3. Alternatively, the bypass contactor/relay could be stuck in a closed position, or there might be a shorted thyristor. In either of these cases, it is best to speak to your ABB Sales Office.

Summary

1 Read this first

2 Description

3 Mounting

4 Connection

Electrical Connection Safety

Critical safety warnings for handling hazardous voltage, installation, and power supply connection.

Main Circuit Connection

Instructions for connecting the main power circuit to the softstarter terminals.

4 Connection

Control Supply and Earthing Connections

Guidelines for connecting control supply voltage and functional earth to the softstarter.

Start;Stop and Input;Output Connections

Instructions for connecting start/stop circuits, programmable inputs, and signal output relays.

4 Connection

Interface Connections and Operation

Details on switching operational voltage, Modbus, sensor, and analog output interfaces.

5 Human Machine Interface (HMI)

HMI Component Overview

Detailed description of all Human Machine Interface (HMI) components and their functions.

6 Softstarter Settings

Initial Setup and Assistants

Procedures for first start-up using the assistant and configuration menu.

Motor Current Configuration Note

Important note on setting the motor rated current 'le' based on connection type.

6 Softstarter Settings

Navigation and Parameter Settings

Guide to navigating the HMI and setting operational parameters.

6 Softstarter Settings

Options Settings and Warnings

Overview of option menus and a critical warning about unexpected motor starts.

7 Troubleshooting

ABB PSTX370 Specifications

General IconGeneral
Product TypeSoftstarter
Rated Operational Current - In Line Connection370 A
Rated Operational Current - Inside Delta Connection640 A
Enclosure RatingIP00
Rated Frequency50/60 Hz
Overload ProtectionYes
Coasting StopYes
Built-in Bypass ContactorYes
Degree of ProtectionIP00
Communication OptionsModbus RTU
Protection FeaturesOverload protection
Trip Class10
Initial Voltage During StartAdjustable 30-70%
Ramp Time30 s