EasyManua.ls Logo

ABB REL650 - Optical Budget Calculation for Serial Communication with LON

ABB REL650
208 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 12: ADE Non group settings (basic)
Name Values (Range) Unit Step Default Description
Operation Off
On
- - Off Operation
TimerClass Slow
Normal
Fast
-
- Slow Timer class
LON commands are available on the local HMI under Main menu/Configuration/
Communication/Station communication/Port configuration/SLM optical LON
pot/Service Pin Messae/Generate service pin message
Table 13: LON commands
Command Command description
ServPinMess Command with confirmation. Transfers the node address to the LON Network
Tool.
7.2 Optical budget calculation for serial communication
with LON
M11737-4 v2
Table 14: Example
Distance 1 km
Glass
Distance10 m
Plastic
Maximum attenuation -11 dB - 7 dB
4 dB/km multi mode: 820 nm - 62.5/125 um 4 dB -
0.3 dB/m plastic: 620 nm - 1mm - 3 dB
Margins for installation, aging, and so on 5 dB 2 dB
Losses in connection box, two contacts (0.75 dB/contact) 1.5 dB -
Losses in connection box, two contacts (1dB/contact) - 2 dB
Margin for repair splices (0.5 dB/splice) 0.5 dB -
Maximum total attenuation 11 dB 7 dB
Section 7 1MRK 506 383-UEN A
Establishing connection and verifying the LON communication
56 Line distance protection REL650 2.2 IEC
Commissioning manual

Table of Contents

Other manuals for ABB REL650

Related product manuals