How to undo forcing changes and return the IED to normal
operation......................................................................................69
Undo forcing by using TESTMODE component.....................69
Undo forcing by using LHMI................................................... 69
Undo forcing by using PCM600..............................................69
Section 9 Testing functionality by secondary injection...................71
Testing disturbance report................................................................71
Introduction..................................................................................71
Disturbance report settings..........................................................71
Disturbance recorder (DR).......................................................... 71
Event recorder (ER) and Event list (EL)...................................... 72
Identifying the function to test in the technical reference manual ....73
Impedance protection....................................................................... 73
Distance protection zones, quadrilateral and mho
characteristic ZMFPDIS...............................................................73
Measuring the operating limit of set values............................ 76
Measuring the operating time of distance protection zones... 77
Completing the test................................................................ 77
Power swing detection ZMRPSB ................................................78
Verifying the settings.............................................................. 79
Testing the power swing detection function ZMRPSB .......... 80
Testing the
tR1
timer.............................................................. 80
Testing the block input, interaction between FDPSPDIS
or FRPSPDIS and ZMRPSB ................................................. 81
Completing the test................................................................ 81
Out-of-step protection OOSPPAM...............................................81
Verifying the settings.............................................................. 82
Test of point RE (R
FwdR
, X
FwdX
)............................................. 86
Test of the boundary between zone 1 and zone 2, which
is defined by the parameter
ReachZ1
.................................... 90
Test of the point SE (R
RvsR
, X
RvsX
)........................................ 95
Automatic switch onto fault logic ZCVPSOF............................... 99
Activating ZCVPSOF externally........................................... 100
Initiating ZCVPSOF automatically and setting mode to
impedance............................................................................100
Initiating ZCVPSOF automatically and setting mode to
UILevel ................................................................................ 100
Completing the test.............................................................. 100
Phase preference logic PPL2PHIZ............................................101
Completing the test....................................................................102
Current protection...........................................................................102
Instantaneous phase overcurrent protection 3-phase output
PHPIOC ....................................................................................102
Table of contents
Line distance protection REL650 2.2 IEC 3
Commissioning manual

Table of Contents