Loading...
The allowed range for the fixing screws’ tightening torque is
0.7...1 Nm.
6. Attach the protective film back on the top side of the case.
7. Install the plug-in unit into the case.
The purpose of the protective film is to prevent debris falling inside the unit while
installing electrical wiring. Remove the protective film before energizing the IED.
A
B
C
D E
F
GUID-BECAF758-CADF-4718-8693-A7D715FBA71E V1 EN
Figure 13: Semi-flush mounted IED
A
280 mm
B 177 mm
C 201 mm
D 103 mm
E 98 mm
F 160 mm
Check the allowed minimum bending radius from the optical cable
manufacturer.
4.3.4 Rack mounting the IED
A mounting kit is needed for rack mounting the IED. The 19" rack mounting kit
includes screws and a mounting panel.
1MRS757641 E Section 4
Mounting
620 series 23