EasyManua.ls Logo

ABB Relion 620 Series - Product documentation

ABB Relion 620 Series
69 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Unpacking, inspecting and storing
3.1 Removing transport packaging
Protection relays require careful handling.
1. Examine the delivered products to ensure that they have not been damaged
during the transport.
2. Remove the transport packaging carefully without force.
3. Attach the protective film (supplied with the protection relay) on the top side of
the unit for the installation phase.
Before connecting the auxiliary power, remove the protective film
from top of the protection relay.
The cardboard packaging material is 100% recyclable.
Unpacking, inspecting and storing 1MRS757641 G
16 620 series
Installation Manual

Table of Contents

Other manuals for ABB Relion 620 Series

Related product manuals