Fit O-ring (42012).
Attach lifting gear to the shackle of the lifting device (90190) and turn
the compressor casing (72000).
Screw three press-off nuts (61090) onto bearing casing studs, equally
distributed around circumference, and screw up to end of thread by
hand.
Push the compressor casing (72000) flush onto the cartridge group
and attach with nuts (61037).
Secure the three press-off nuts (61090) against the compressor casing
(72000) with the appropriate tightening torque (see chapter Table of
tightening torques).
Remove lifting device (90190).

Table of Contents

Other manuals for ABB TPL67-C Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB TPL67-C Series and is the answer not in the manual?

ABB TPL67-C Series Specifications

General IconGeneral
BrandABB
ModelTPL67-C Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals