6. Assembly of the switchgear at site
Figure 110:
1 nr. 4 10x60 screws
2 nr. 8 M10 washers
3 nr. 4 M10 nuts
4 nr. 1 spacer (15 mm)
12 / 17.5 kV panels - T-off 630 -1 250 A, busbars 1 600, 2 000, 2 500 A
Figure 111:
1 nr. 4 10x60 screws
2 nr. 8 M10 washers
3 nr. 1 spacer (5 mm)
4 nr. 4 M10 nuts
12 / 17.5 kV panels - T-off 1 600, 2 000, 2 500 A, busbars 1 600, 2 000, 2 500 A