6. Assembly of the switchgear at site
1 nr. 4 10x60 screws
2 nr. 8 M10 washers
3 nr. 4 M10 nuts
4 nr. 1 spacer (15 mm)
12 / 17.5 kV panels - T-off 630, 1 250 A, busbars 3 150, 3 600, 4 000 A, open D
1 nr. 4 10x60 screws
2 nr. 8 M10 washers
3 nr. 4 M10 nuts
4 nr. 1 spacer (15 mm)
12 / 17.5 kV panels - T-off 630, 1 250 A, busbars 3 150, 3 600, 4 000 AFigure 112:
Figure 113: