- 58 -
000687AG
5 - Installation
During installation do not
place the inverter with the
front cover
05
facing the
ground.
Install the inverter by following this
procedure:
• Place the bracket
01
perfectly level
on the wall and use it as a drilling
template.
• The selection of the appropriate num-
ber and distribution of the anchors is
the responsibility of the installer. The
choice must be made according to
the type of wall, frame or other type
of support, and should be sized con-
sidering a total load of more than
4 times the weight of the inverter
(total 4x15=60 kg total). Depending
on the type of anchor chosen, drill
the holes required for the xing of the
bracket
01
(Figure
A
).
• Fix the bracket
01
to the wall or
structure
• Carefully lift the inverter and hook
it to the bracket
01
by inserting the
two supports in the slots on the in-
verter (Figure
B
).
• Proceed to anchor the inverter to the
bracket by pressing the lower part
toward the wall or structure until the
two springs
02
on the bracket
01
set
the inverter in position (Figure
B
).
Wall mounting
A
B