36 ABB Power Distribution
Figure 5/12: Insulating covers for busbars
58 Insulating cover
58.1 Support for cover
58.5 Lid (for 17.5 kV only)
Figure 5/11: Installation of the busbars
28 Bushing plate
28.1 „Panel partitioning“ bag group
29 Busbar bushing
29.2 Busbar support for double conductor
58 Insulating cover
58.1 Support for cover
58.5 Lid (for 17.5 kV only)
58.6 Washer, DIN 125
58.7 Washer, 25 mm diameter
29 58 29.2
28.1
X 58.1
58.5 58.6 58.7 58.1
Detail X
28
58
84
180
104
30
15
ø 108
Cutting location for
tee-off conductor
system 2 x 100 x 10
20
23
60
32
15
58.1
45
38
ø 110
58.5
Cutting location for
tee-off conductor
system 2 x 100 x 10