EasyManua.ls Logo

Absen AW Series - Page 16

Absen AW Series
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service hotline400-700-3278
5 Fix the boxes with M8 * 30mm screws
Screw fixing position between left and right boxes
Screw fixing position between the upper and lower cases
Please pay attention to the fixing screws between the left and right boxes and the upper and
lower boxes during installation.
Left and right connection diagram M8 * 30 screws and nuts
6Connected network cable and power supply;
Use the network cable output cable from the previous cabinet to pass through the network
cable jack of the next cabinet and connect to the HUB board;
7Power on and test the power and network cables of the screen are plugged in well or not;
Before powering on, please test the power supply to ensure that the power cord is connected
correctly before you power on;

Related product manuals